ADS-B Ground Radio Network Is Completed, FAA Says
The system will be “connected and operating” at all 230 ATC facilities by 2019.
The FAA has installed a nationwide network of ADS-B ground stations, but aircraft operators are slow to equip. (Image: Exelis)
The FAA has installed a nationwide network of ADS-B ground stations, but aircraft operators are slow to equip. (Image: Exelis)