HondaJet Production Line Starts Rolling Along

AINalerts » October 30, 2012
October 30, 2012, 3:40 PM

Honda Aircraft has started the production line for its $4.5 million HondaJet entry-level twinjet, the company announced yesterday at the NBAA Convention. A handful of initial customer aircraft are scheduled to be completed next year, along with aircraft certification.

“An assembly line for HondaJet production is in place; major aircraft components, including the fuselage and wing, have been produced; and we have started assembly of the first customer aircraft,” said Honda Aircraft president Michimasa Fujino.

The company is continuing its aggressive flight-test program at its Greensboro, N.C. campus with six test aircraft that have met major milestones this year, according to Fujino. Recent testing includes hot fuel testing, fuselage structure temperature validation and GE Honda HF120 powerplant and electrical generator cooling.

The fifth conforming flight-test aircraft recently completed power-on electrical testing and will be fitted with a production interior before joining the fleet early next year. Currently three aircraft are in flight test, one is being used for ground test, and another for recently completed and successful structural load testing.

FILED UNDER: 
Share this...

Please Register

In order to leave comments you will now need to be a registered user. This change in policy is to protect our site from an increased number of spam comments. Additionally, in the near future you will be able to better manage your AIN subscriptions via this registration system. If you already have an account, click here to log in. Otherwise, click here to register.

 
X