Max Efficiency Must Extend to Boeing’s 737 Production Line
To fit new designs into the present production scheme while maintaining flow times, Boeing must consider how long each part takes to build.
Boeing expects production of the 737 in Renton, Washington to reach a rate of 47 a month in 2017. (Photo: Gregory Polek)
Boeing expects production of the 737 in Renton, Washington to reach a rate of 47 a month in 2017. (Photo: Gregory Polek)