Inspection Required of GV Balance Weight Installation

Aviation International News » October 2003
October 8, 2007, 6:55 AM

A one-time inspection is required to ensure that all installation fasteners are in place for the left and right aileron balance weights on Gulfstream Vs, in accordance with a September 26 AD (2003-18-11). Investigation of a GV that lost aileron control on final approach revealed that the outboard balance weight of the left aileron had detached and was wedged between the aileron and the rear beam of the wing. Further investigation revealed that all nine fastener assemblies for the balance weight were missing because they had not been installed properly during assembly, according to the FAA.

FILED UNDER: 
Share this...

Please Register

In order to leave comments you will now need to be a registered user. This change in policy is to protect our site from an increased number of spam comments. Additionally, in the near future you will be able to better manage your AIN subscriptions via this registration system. If you already have an account, click here to log in. Otherwise, click here to register.

 
X