Vikrant class aircraft carrier

August 10, 2012 - 2:05pm
Indian LCA

With India’s first indigenous carrier (IAC-1) now under construction at the Cochin shipyard, there is speculation surrounding future aircraft carriers, and Chief of Naval Staff Admiral Nirmal Verma told AIN that the design of the second carrier has not been decided. IAC-1 has a ski jump, but it has not been decided yet whether a planned second indigenous carrier (IAC-2) would be similarly equipped with a ski jump for short-takeoff but arrested recovery (Stobar) operations. Russia has proposed joint development of an advanced carrier design to India.

May 4, 2012 - 2:15pm
Naval LCA

The naval prototype of India’s Tejas light combat aircraft (LCA) made its first test flight on April 27. Already delayed by four years, the program still faces design concerns, including weight. Strengthening of the rear airframe for carrier operations, and the addition of an arrestor hook, has made the aircraft about 1,000 pounds overweight.