SEARCH:
 
News
Aviation International News
Airshow & Convention News
AIN Defense Perspective
AIN Air Transport Perspective
Business Jet Traveler
AINalerts
AINmxReports
AINtv

Look inside Current Issue

SUBSCRIBE NOW...

SPECIAL REPORTS

Bizav Web Directory
Visit our directory of manufacturers, suppliers and service providers

Issue Archives
Search through years of
AIN past issues


CALENDAR OF EVENTS
Search through the latest
events and conferences



REPRINTS

RSS Feed



Acoustic Package Claimed To Cut Cabin Noise by 30 Percent

A new thermal/acoustic barrier package promises to reduce cabin noise by as much as 30 percent. The Silentium Air SPS 360 is a product of Aviation International Management Services (AIMS) of Montreal, which is supplying the kits to exclusive marketing agent Zenith Jet, also of Montreal.

At the core of the Silentium product is a standard micro-light blanket, to which two layers of proprietary material are bonded. The entire package is custom-designed for each aircraft, taking into consideration such noise sources as pumps and actuators. Also part of the package is the application of noise damping material to the interior of the aircraft skin and flooring.

According to AIMS v-p of program management Abdul Hajibrahim, the Silentium Air package has been installed and tested in more than 30 business aircraft, from a Learjet 55 to a Boeing Business Jet. The result, he said, is a reduction in average cabin noise of as much as 5 dB (SIL), the equivalent of a 30-percent drop in the speech interference level (SIL). The results, he added, are not measured under laboratory conditions, but on board actual aircraft.

In addition, he pointed out, the total Silentium Air package in a Challenger 601 used as a test aircraft weighed 500 pounds less than the factory-installed thermal/acoustic package.

For a 600-series Challenger, the product is priced in the $200,000 range and includes the Silentium blanket and sound damping material applied to the interior aircraft skin and flooring, as well as engineering support and drawings. “The only thing not included is labor,” said Zenith board member Jahid Fazal-Karim.

Installation of the package requires as little as seven working days and can be performed by any authorized maintenance, repair and overhaul center. Zenith and AIMS also provide the on-site services of one of its technicians during the installation process.

Back

Share This Article With Others

Tweet thisDigg thisRedditBookmark on deliciousStumble thisShare on FacebookFave on Technorati

Related Articles

Completions and Refurbishment
July 01, 2009

Economic crisis takes its toll

 
Sabena Wins P.180 Avanti Paint Work
June 18, 2009

Piaggio Aero has signed an memorandum of understanding with Sabena Technics that sets the framework for a contract to paint part of its P.180...

 
Airbus adds Spice to save weight
June 18, 2009

Economic pressure on airlines has led Airbus to work with them along with caterers and galley suppliers to develop what it has dubbed...

 
PPG window coating is a real cool idea
June 17, 2009

PPG Aerospace is developing transparencies for aircraft cockpit and cabin windows that help keep the interior cooler by reducing heat from the...

 
Eurocopter upgrades 145 with new ‘Stylence’ cabin
June 16, 2009

Eurocopter’s EC 145 light twin-engine helicopter has received a makeover in the form of the Stylence (a play on “style” and “silence”) interior...