SEARCH:
 
News
Aviation International News
Airshow & Convention News
AIN Defense Perspective
AIN Air Transport Perspective
Business Jet Traveler
AINalerts
AINmxReports
AINtv

Look inside Current Issue

SUBSCRIBE NOW...

SPECIAL REPORTS

Bizav Web Directory
Visit our directory of manufacturers, suppliers and service providers

Issue Archives
Search through years of
AIN past issues


CALENDAR OF EVENTS
Search through the latest
events and conferences



REPRINTS

RSS Feed



How Soon Is ‘Soon’ for Hawker 4000 Deliveries?

There are now 23 Hawker 4000s in the completion pipeline as Hawker Beechcraft continues function and reliability testing, the last phase before the FAA will allow deliveries to proceed. While Hawker Beechcraft predecessor Raytheon Aircraft did obtain FAA type certification for the super-midsize business jet in November 2006, it came with a catch–the company’s certification tests took so long that the design would have to meet additional, new fuel tank and hydraulic requirements by this coming May.

The first Hawker 4000 was ceremonially delivered in December 2006, but it was a lease-back demonstrator and the owner never took possession of the airplane. In fact, this airplane still remains registered to the manufacturer, as do the other 22 flying customer Hawker 4000s and five flight-test aircraft.

A spokesman said Hawker Beechcraft will start delivering Hawker 4000s “soon,” something the Wichita-based company has been saying for about a month now. But the end of the tunnel might actually be near for Hawker Beechcraft–a Hawker 4000 customer told AIN that the first delivery could happen as early as this week.

The company spokesman, however, was not able to confirm this timeline.



Back

Share This Article With Others

Tweet thisDigg thisRedditBookmark on deliciousStumble thisShare on FacebookFave on Technorati

Related Articles

Cirrus Jet vision Resumes Flying
July 01, 2009

As Cirrus Aircraft’s prototype Vision jet single resumes flight testing with a new Garmin G1000 avionics suite, some buyers seeking refunds of...

 
First Gulfstream G250 Is Taking Shape
July 01, 2009

The first Gulfstream G250 super-midsize business jet had its Honeywell HTF7250G engines mounted on June 1 at Israel Aerospace Industries’...

 
Spectrum Completes First S.40 Fuselage
July 01, 2009

Spectrum Aeronautical sister company Rocky Mountain Composites completed a test article version of the all-composite S.40 Freedom midsize jet...

 
Aerion Formal Launch in Late 2010?
July 01, 2009

Aerion last month at the Paris Air Show said it is nearing a decision on an aerospace manufacturing partner to lead the development and...

 
Dassault embraces green technology
July 01, 2009

With an eye toward ever-increasing environmental awareness, Dassault Aviation is aiming for 2020 entry into service for new technologies that...