Cessna 441

September 26, 2007 - 11:25am

Australia’s Civil Aviation Authority (CASA) has grounded several Cessna 441 Conquest IIs, citing the potential for in-flight structural failures on aircraft that have surpassed 22,500 hours. CASA stated that the defect, located near the rear pressure dome, could cause the tail to separate during flight.

August 28, 2007 - 12:28pm

Australia’s Civil Aviation Authority (CASA) has grounded several Cessna 441 Conquest II turboprops, citing the potential for in-flight structural failures on aircraft that have surpassed 22,500 hours. CASA stated that the defect, located near the rear pressure dome, could cause the tail to separate during flight.

January 29, 2007 - 10:58am

Honeywell has delivered the first production TPE331-12JR-701S turboprop powerplant to Aero Twin in Anchorage, Alaska, for its “850 Caravan” re-engine modification program. The 850-shp engine, certified last September, will replace the original 675-shp P&WC PT6 on the big Cessna single. Aero Twin expects to receive an STC for the conversion this spring.

January 25, 2007 - 4:04am

Yingling doesn’t do beer. That’s Yuengling in Pottsville, Pa. Yingling Aviation in Wichita does business aircraft. Most recently, Yingling has created a joint ownership program offering partnerships on refurbished and updated Cessna Conquests. The program was launched with a 441 Conquest II and a 425 Conquest I, for which Yingling’s completion and refurbishment center did major cabin modifications.

November 13, 2006 - 5:56am

Blackhawk Modifications (Booth No. 5176) is offering a Pratt & Whitney Canada PT6A-135A upgrade for the Raytheon King Air F90. According to the Waco, Texas company, the upgrade gives the F90 the same performance as the F90-1.

September 26, 2006 - 11:17am

Spokane, Wash.-based Rocket Engineering is developing the Turbine P Baron in parallel with the Royal Turbine Duke program. The Baron conversion, which fits two PT6A-21 turboprops and Hartzell four-blade props to the light twin, costs about $700,000 (airframe additional). The company plans to have an STC in 12 to 18 months.

 
X