Gavião Peixoto

May 15, 2008 - 11:20am

The 149,500-sq-ft Phenom 100/300 final assembly and completions facility that Embraer is building at Melbourne (Fla.) Airport will substantially increase the aircraft manufacturer’s production capacity for the two small jets.

April 30, 2008 - 6:44am
...

Embraer’s Phenom 300 light jet flew for the first time yesterday, months ahead of its planned mid-year first flight schedule, lifting off from the 16,295-foot runway at Embraer’s private Unidade Gavião Peixoto Airport in Brazil for a one-hour, 22-minute flight.

April 28, 2008 - 7:07am
...

Ten months after Embraer rolled out its Phenom 100 VLJ, its larger stablemate made its debut at the company’s Gavião Peixoto plant in Brazil. With an anticipated entry-into-service date of the second half of next year, the Phenom 300 will undergo a series of ground tests before making its first flight–currently scheduled for the middle of this year.

April 15, 2008 - 10:50am
...

Embraer rolled out the first Phenom 300 light jet at its Gavião Peixoto plant in São Paulo, Brazil, on Saturday, less than three years after the manufacturer announced the twinjet and its smaller sibling, the Phenom 100.

February 8, 2008 - 4:46am

Embraer’s entry into the very light jet market–the Phenom 100– is progressing toward certification and entry into service by the middle of this year. The third Phenom 100 made its first flight on December 21 at the company’s Gavião Peixoto facility near São Paulo, Brazil. The Phenom 100 flight test fleet has logged more than 250 hours in more than 260 flights, according to Embraer.

February 8, 2008 - 4:46am

Embraer’s entry into the very light jet market–the Phenom 100– is progressing toward certification and entry into service by the middle of this year. The third Phenom 100 made its first flight on December 21 at the company’s Gavião Peixoto facility near São Paulo, Brazil. The Phenom 100 flight test fleet has logged more than 250 hours in more than 260 flights, according to Embraer.

February 6, 2008 - 10:21am

Embraer recently completed the production plant in Gavião Peixoto near São Paulo, Brazil, for its Phenom 100 and 300 jets. The final assembly plant is expected to build between 120 and 150 jets annually starting next year. Meanwhile, the third flying Phenom 100 joined the flight-test fleet in late December, and Embraer expects to receive Brazilian certification for the very light jet within six months.

February 6, 2008 - 10:21am

Embraer recently completed the production plant in Gavião Peixoto near São Paulo, Brazil, for its Phenom 100 and 300 jets. The final assembly plant is expected to build between 120 and 150 jets annually starting next year. Meanwhile, the third flying Phenom 100 joined the flight-test fleet in late December, and Embraer expects to receive Brazilian certification for the very light jet within six months.

May 21, 2007 - 6:55pm

Cessna and Eclipse are about to feel some Brazilian heat. The first Phenom 100 very light jet being assembled at manufacturer Embraer’s São José dos Campos factory is scheduled for its first flight next month.

As the first three Phenom 100s slated for the certification program are being completed at the main São José dos Campos plant, Embraer is putting into place a multi-site production strategy for the Phenom program.

April 30, 2007 - 6:38am

Embraer has begun construction of its second Phenom 100 airframe and is on schedule for planned first flight in the middle of this year and entry-into-service in the middle of next year. The first all-metal Phenom 100 VLJs will be assembled at Embraer’s main plant in São José dos Campos, Brazil.

 
X