New York TRACON

December 5, 2013 - 12:25am

BBA Aviation subsidiary Signature Flight Support’s new FBO at Newark International Airport (EWR) opened last month, after an 18-month construction project. The $11 million facility occupies approximately 11 acres at the airport. It features a 39,000-sq-ft hangar and an 11,200-sq-ft terminal serving as the prototype for Signature’s newly designed interior traffic flow pattern. Built to Leed Gold standard, the terminal provides three lounges, including a separate VIP area.

March 24, 2011 - 1:03pm

The air traffic controller at the center of the controversy surrounding a pair of flights that had to land at Ronald Reagan Washington National Airport early Wednesday morning without ATC clearance from DCA told NTSB investigators that he had fallen asleep, the Safety Board reported this evening.

April 30, 2009 - 5:52am

For the upcoming thunderstorm season, the FAA is changing the severe weather avoidance plan (Swap) to cut down on gate holds and takeoff delays associated with route closures. During future Swap events, New York Tracon will staff a phone position to handle alternate routing requests from flight-planning service providers.

June 24, 2008 - 11:53am

The Transportation Department’s plan to manage congestion at New York’s three area airports drew criticism from industry witnesses and members of Congress last week, and the head of the airline lobby once again used the forum to label business aviation a “significant contributor” to delays in the Northeast corridor.

May 5, 2008 - 7:06am

The New York Air Route Traffic Control Center (ARTCC) and the New York Tracon will be combined into one building under an FAA plan to integrate air traffic services in the New York, New Jersey and Philadelphia metropolitan areas.

October 4, 2006 - 12:07pm

The FAA and the National Air Traffic Controllers Association are at loggerheads over an FAA report describing staffing levels, scheduling abnormalities, excessive overtime, ineffective management and “threats, intimidation and inappropriate behavior” at the New York Tracon.

September 21, 2006 - 11:32am

The 90-day performance tolerance standard assessment was prompted by a review at New York Tracon conducted last year that revealed some small operational-error violations on final approach that were detected by later examination of radar records. Controllers are not being assessed an operational error on final approach if aircraft separation is inadvertently reduced from 3 nm to 2.7 nm (excluding larger separation standards for heavies).

 
X