The air force commanders of both Russia and India have this month discussed the progress and future schedule of the fifth-generation Sukhoi fighter project. They are keen to have their own pilots evaluate the design so that they can take a decision on further funding for the project.
Sukhoi/HAL FGFA
Russia’s defense industry is looking this week’s Aero India show as a platform from which to bounce back from recent defeats in international tender contests.
Hindustan Aeronautics Ltd. (HAL) is expected to unveil an armed variant of its Rudra advanced light helicopter (ALH) at the Aero India show this week. The helicopter will be in the flying display along with the HAL Light Combat Helicopter.
More than 10 months after India chose the French Rafale to meet its $15 billion medium multi-role combat aircraft (MMRCA) requirement, contract negotiations are mired in issues related to offsets, the transfer of technology and the role of Hindustan Aeronautics (HAL).
Government-owned Indian defense manufacturer Hindustan Aeronautics Ltd. (HAL) has
launched a $12 million Strategic Electronics Manufacturing facility spread across 196 acres in Kasargod in the southern state of Kerala. It will produce advanced avionics for aircraft and helicopters. The facility is the manufacturing extension of HAL’s Hyderabad-based R&D unit for avionics–the Strategic Electronics Research and Design Center.
An Indian negotiating team is heading for Russia to finalize details of the country’s participation in development of the Sukhoi T-50, also known by the Russian acronym PAK FA and by India as the Fifth Generation Fighter Aircraft (FGFA). India is providing half of the expected $11 billion cost to develop the aircraft, and earlier signed a preliminary design contract worth $295 million.
The third prototype of Russia’s new T-50 stealth fighter now has an AESA radar. Sukhoi reported this month that the program has logged more than 120 test flights, which suggests that only some 20 flights have been made in the past nine months. However, Russian air force commander Gen.
The joint Indo-Russian project to produce a fifth-generation fighter aircraft (FGFA) for the Indian Air Force is facing a two-year delay. It will now take nine years instead of the stipulated seven to develop. The Indian Air Force attributes the delay to Hindustan Aeronautics (HAL), which has a workshare of 25 percent in the program.
Sukhoi’s T-50 fifth-generation fighter program has made significant strides since the first aircraft (T-50-1) flew at the Knaapo factory’s airfield back in January 2010. The most important recent milestone is the first flight of the second aircraft (T-50-2), which is now scheduled to join T-50-1 in flight trials.
Sukhoi has completed its preliminary flight and bench trials program for the T-50 PAK-FA fighter. Three airframes were built for the initial campaign, comprising one static aircraft (T-50-0), one flying prototype (T-50-1) and an avionics testbed (T-50-2). A display flight by T-50-1 on June 17 in front of Russian Prime Minister Vladimir Putin marked the 16th time the aircraft had flown.