P-8A Poseidon Readied For Submarine Warfare
The second of three low-rate initial production (LRIP) lots of the P-8A Poseidon was cycling through the mission systems installation and checkout facility at Boeing Field a few weeks ago. The three LRIP lots will produce 24 jets.
The second of three low-rate initial production (LRIP) lots of the P-8A Poseidon was cycling through the mission systems installation and checkout facility at Boeing Field a few weeks ago. The three LRIP lots will produce 24 jets.