European ADS-B out Mandate

The ADS-B Out requirement in Europe has been postponed from June 7, 2020 to Dec. 7, 2020 for aircraft receiving their certificate of airworthiness (C of A) on or after December 7. Aircraft that obtained their C of A between June 6, 1995 and June 6, 2020 must meet the ADS-B Out mandate by June 7, 2023. Both deadlines apply only to aircraft with an mtow exceeding 5,700 kg (12,566 pounds) or having a maximum cruising true airspeed capability greater than 250 knots. Aircraft with a C of A dated before June 6, 1995 are exempt from European ADS-B requirements.

Deadline: 
December 7, 2020June 7, 2023